110
Irving Street, NW
- Washington DC 20010
|
 |
|
|
|
 |
|
|
|
|
 |
- The
raised stone
wall is the
outside of the
addition to
the hospital
that houses
the Linear Accelerator
facility.
- This
job required
GreenCrest to
oversee multiple
contractors
to complete
this job and
clearly demonstrating
GreenCrests'
Ability to complete
Hospital projects
logistically
working with
traffic patterns,
noise control
and mitigation
and building
processes minimizing
interference
with the daily
routine or disrupting
the Rhythm of
hospital operations
- State
of the Art Linear
Accelerator
GC 175
- Two
Lin Acc rooms:
Lighted Photos
on the wall
- Air
tanks and UV
lights: these
are silver boxes
on the walls
that will sanitize
the entire room
when the room
is motionless
for a specific
amount of time
- Shower
Room, Critical
Care Carts,
Stretchers,
wheel chairs
and gurneys
- Command
Center - entrance
to the Ready
Room
- Signs
for emergency
and de-con Ready
Room Air Handler;
self contained,
recycles air
incase of dirty
bombs or nuclear
fall out.
- Exhaust
Fan for Ready
Room: This Ready
Room demonstrates
the specialized
jobs that GreenCrest
contracting
is capable of
doing. Tthis
room is unique
to hospitals
in the D.C.
metro area and
was built in
response to
the need for
these types
of facilities
from the 911
attack.
|
|
|
 |