home
110 Irving Street, NW - Washington DC 20010

  • The raised stone wall is the outside of the addition to the hospital that houses the Linear Accelerator facility.

  • This job required GreenCrest to oversee multiple contractors to complete this job and clearly demonstrating GreenCrests' Ability to complete Hospital projects logistically working with traffic patterns, noise control and mitigation and building processes minimizing interference with the daily routine or disrupting the Rhythm of hospital operations

  • State of the Art Linear Accelerator GC 175

  • Two Lin Acc rooms: Lighted Photos on the wall

  • Air tanks and UV lights: these are silver boxes on the walls that will sanitize the entire room when the room is motionless for a specific amount of time

  • Shower Room, Critical Care Carts, Stretchers, wheel chairs and gurneys

  • Command Center - entrance to the Ready Room

  • Signs for emergency and de-con Ready Room Air Handler; self contained, recycles air incase of dirty bombs or nuclear fall out.

  • Exhaust Fan for Ready Room: This Ready Room demonstrates the specialized jobs that GreenCrest contracting is capable of doing. Tthis room is unique to hospitals in the D.C. metro area and was built in response to the need for these types of facilities from the 911 attack.



Copyright ©2010 GreenCrest Contracting, Inc. 313 Najoles Rd., Suite C, Millersville, MD 21108
Office 301.386.0890 | Fax 301.386.0782 | info@greencrestcontracting.com